DataSelf has been working and optimizing the Sage 100 Providex data extraction since 2005.
Introduction to DataSelf
Installation Checklist
Click here to fill out the DataSelf Analytics Deployment Form.
Set up a Sage 100 Providex ODBC DSN. ETL+ uses ODBC to extract data from Sage 100 Providex. Set up the ODBC on the same computer where ETL+ will be installed.
...
If you haven’t installed ETL+ yet: ETL+ Deployment Instructions.
See Sage 100 Providex ODBC DSN Setup - Summarized for how to configure the ODBC driver.
On the ETL main page, right-click
Sage 100
on the left panel → Properties /wiki/spaces/DS/pages/2001502390.If a Microsoft SQL Server (instead of ODBC) page pops up, click the
Change Data Source
wrench icon →ODBC
.
On the
ODBC Data Sources
/wiki/spaces/DS/pages/2001502390 page, select the correct Providex ODBC Name from the list.Can’t find your ODBC? It’s likely because your Providex ODBC is 32-bit: Download the DataSelf ETL+ 32bits file from here. Then copy/paste the downloaded file into
C:\Program Files\DataSelf ETL Plus
. Confirm the overwrite prompt.ODBC requiring credentials:
double-click the ODBC name
→enter credentials
(example: username or username|CompanyCode, and password) →Connect
If it fails, try adding the ODBC credentials.
Customize the Alias as desired.
Click Connect.
You’ll get back return to the ETL page and see tables under the Sage 100 source on the left panel.
...
On the ETL main page, click
Refresh Batch
Job
(top right icon on the center panel).The Refresh Batch page (help here) Job page usually comes pre-configured to your source system(s).
Overview this page’s configuration. On the right panel, feel free to uncheck tables and Tableau extracts that don’t apply to your reporting needs.
Run a Refresh Batch Job now (optional): click the
Refresh Batch Now
Run Job
(play icon) on the left panel.To schedule the data load (optional):
Click
WTS Settings
-> enter the WTS parameters →Apply
.This step might require you to run ETL+ app as “Run as administrator” in Windows.
Select a Job → Job Properties (wrench icon) → configure the schedule panel → Save
Click
Close
->Close
.
Level 1 Testing
...
ETL+ must have already loaded your data manually or scheduled.
Steps
On the ETL main page, click the top-right
Log
icon. Log page help here.Scroll down on the log page and double-check that no table load failed, and the row count matches with the Sage 100 tables. Following is an example highlighting two tables and their loaded row count.
...